The Drum Wind Farm, Cumnock, Ayrshire, KA18

The Drum Wind Farm is a 49.6 MW onshore wind project in Scotland. The applicant or operator on record is Wind Estate (UK) Ltd. The planning application was refused. The determining authority is East Ayrshire, reference 22/0792/PP.…

Refused
Project stageRefused
  1. PlanningFeb 2023 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2026-05-08.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.600 MW
Registered Capacity

πŸ“‹ Project Overview

The Drum Wind Farm is a 49.6 MW onshore wind project in Scotland. The applicant or operator on record is Wind Estate (UK) Ltd. The planning application was refused. The determining authority is East Ayrshire, reference 22/0792/PP.

Site Schematic

SCOTLAND Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)49.600 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWind Estate (UK) Ltd
Owner / operatorWind Estate (UK) Ltd
LocationThe Drum Wind Farm, Cumnock, Ayrshire, KA18
RegionScotland
Coordinates55.4699136Β°N, 4.1584847Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)6.2
No. of Turbines8
Height of Turbines (m)220

πŸ“… Project Timeline

2023-02-28