πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Solar Farm

The Down House

Land At E 385926 104812, Down House Estate, Blandford St. Mary, Blandford Forum, Dorset, DT11 9AD

The Down House is a 5 MW solar farm project in South West. The applicant or operator on record is British Solar Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is Dorset, reference 2/2015/1129/PAEIA.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningSep 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedMar 2017 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2018-10-26.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity

πŸ“‹ Project Overview

The Down House is a 5 MW solar farm project in South West. The applicant or operator on record is British Solar Renewables. The application has been withdrawn or the scheme abandoned. The determining authority is Dorset, reference 2/2015/1129/PAEIA.

Site Schematic

SUBSTATION ? ha Β· 5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperBritish Solar Renewables
Owner / operatorBritish Solar Renewables
Year consented2017
LocationLand At E 385926 104812, Down House Estate, Blandford St. Mary, Blandford Forum, Dorset, DT11 9AD
RegionSouth West
Coordinates50.8408061Β°N, 2.1905849Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround

πŸ“… Project Timeline

2015-09-16
2017-03-31