π Project Overview
The British Library Building, Boston Spa - Solar PV Equipment is a 0.21 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is SCS Lighting And Renewables. Planning permission has been granted as of February 2025 and it is awaiting construction. The determining authority is Leeds, reference 24/07298/DPD.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | SCS Lighting And Renewables |
| Owner / operator | SCS Lighting And Renewables |
| Year consented | 2025 |
| Location | The British Library Building, 31 Boston Spa, Wetherby, West Yorkshire, LS23 7BQ |
| Region | Yorkshire and Humber |
| Coordinates | 53.9197431Β°N, 1.3214313Β°W |