The Balk, Almholme - Solar Farm

The Balk, Almholme, Doncaster, South Yorkshire, DN5 0LL

The Balk, Almholme - Solar Farm is a 49.9 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Innova Renewables. Planning permission has been granted as of October 2024 and it is awaiting construction. The determining authority is Doncaster, refe…

Consented / Approved
50 MW
Installed Capacity

πŸ“‹ Project Overview

The Balk, Almholme - Solar Farm is a 49.9 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Innova Renewables. Planning permission has been granted as of October 2024 and it is awaiting construction. The determining authority is Doncaster, reference 23/02482/FULM.

Site Schematic

SUBSTATION ? ha Β· 49.9 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)50 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperInnova Renewables
Owner / operatorInnova Renewables
Year consented2024
LocationThe Balk, Almholme, Doncaster, South Yorkshire, DN5 0LL
RegionYorkshire and Humber
Coordinates53.5670835Β°N, 1.131339Β°W