The Balk, Almholme, Doncaster, South Yorkshire, DN5 0LL
The Balk, Almholme - Solar Farm is a 49.9 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Innova Renewables. Planning permission has been granted as of October 2024 and it is awaiting construction. The determining authority is Doncaster, refeβ¦
Consented / Approved
Project stageConsented
PlanningNov 2023 (completed)
ConsentedOct 2024 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2024-10-28.
Registered planning capacity; not measured generation.
The Balk, Almholme - Solar Farm is a 49.9 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Innova Renewables. Planning permission has been granted as of October 2024 and it is awaiting construction. The determining authority is Doncaster, reference 23/02482/FULM.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.900 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Innova Renewables
Owner / operator
Innova Renewables
Year consented
2024
Location
The Balk, Almholme, Doncaster, South Yorkshire, DN5 0LL