Tesco Stores, Marshall Road - Solar Panels is a 0.21 MW solar farm project in South East. The applicant or operator on record is EDF Energy Renewables. Planning permission has been granted as of December 2025 and it is awaiting construction. The determining authority is Bracknell Forest, reference 25/00612/PAS.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | EDF Energy Renewables |
| Owner / operator | EDF Energy Renewables |
| Year consented | 2025 |
| Location | Tesco Stores Limited, The Meadows, Marshall Road, Sandhurst, Berkshire, GU47 0FD |
| Region | South East |