Tesco Ilminster - Solar Panels is a 0.25 MW solar farm project in South West. The applicant or operator on record is Tesco Stores Limited. The planning application was refused. The determining authority is Somerset, reference 21/00209/PAPV.β¦
Refused
Project stageRefused
PlanningJun 2021 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2021-08-02.
Registered planning capacity; not measured generation.
Tesco Ilminster - Solar Panels is a 0.25 MW solar farm project in South West. The applicant or operator on record is Tesco Stores Limited. The planning application was refused. The determining authority is Somerset, reference 21/00209/PAPV.