Tesco Distribution Centre (Livingston) is a 6.5 MW bioenergy / waste project in Scotland. The applicant or operator on record is Tesco. The application has been withdrawn or the scheme abandoned. The determining authority is West Lothian, reference 0467/FUL/10.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJun 2010 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedDec 2010 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2015-12-08.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

6.500 MW
Registered Capacity

πŸ“‹ Project Overview

Tesco Distribution Centre (Livingston) is a 6.5 MW bioenergy / waste project in Scotland. The applicant or operator on record is Tesco. The application has been withdrawn or the scheme abandoned. The determining authority is West Lothian, reference 0467/FUL/10.

πŸ”§ Technical Specifications

Capacity (MW)6.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperTesco
Owner / operatorTesco
Year consented2010
LocationCarnegie Road, Deans Industrial Estate, Livingston, Lothian, EH54 8TB
RegionScotland
Coordinates55.9040966Β°N, 3.5839049Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2010-06-30
2010-12-08