Bioenergy / Waste

Tesco Distribution Centre, Goole

Tesco Distribution Centre, Capitol Park, Rawcliffee Road, Goole,, Humberside, DN14 6XL

Tesco Distribution Centre, Goole is a 5 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Tesco. The application has been withdrawn or the scheme abandoned. The determining authority is East Riding of Yorkshire, reference 11/02623/STPLFE…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningAug 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJul 2008 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2015-12-08.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity

πŸ“‹ Project Overview

Tesco Distribution Centre, Goole is a 5 MW bioenergy / waste project in Yorkshire and Humber. The applicant or operator on record is Tesco. The application has been withdrawn or the scheme abandoned. The determining authority is East Riding of Yorkshire, reference 11/02623/STPLFE.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperTesco
Owner / operatorTesco
Year consented2008
LocationTesco Distribution Centre, Capitol Park, Rawcliffee Road, Goole,, Humberside, DN14 6XL
RegionYorkshire and Humber
Coordinates53.7047653Β°N, 0.8999556Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2007-08-22
2008-07-17