Tenpin Centre Severn Barnwood Link Road, Gloucestershire, GL4 3HR
Tenpin Centre, Severn Barnwood Link Road - Solar Panels is a 0.22 MW solar farm project in South West. The applicant or operator on record is Ivegate Limited. Planning permission has been granted as of October 2023 and it is awaiting construction. The determining authority is Gloβ¦
Consented / Approved
Project stageConsented
PlanningAug 2023 (completed)
ConsentedOct 2023 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2023-10-30.
Registered planning capacity; not measured generation.
Tenpin Centre, Severn Barnwood Link Road - Solar Panels is a 0.22 MW solar farm project in South West. The applicant or operator on record is Ivegate Limited. Planning permission has been granted as of October 2023 and it is awaiting construction. The determining authority is Gloucester, reference 23/00599/SOLAR.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.220 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Ivegate Limited
Owner / operator
Ivegate Limited
Year consented
2023
Location
Tenpin Centre Severn Barnwood Link Road, Gloucestershire, GL4 3HR