Tennis Courts, St Brides Castle, St Brides, Haverfordwest, Dyfed, SA62 3AL
Tennis Courts, St Brides Castle - Solar Panels is a 0.24 MW solar farm project in Wales. The applicant or operator on record is HPB Assurance Limited. Planning permission has been granted as of April 2026 and it is awaiting construction. The determining authority is Pembrokeshireβ¦
Consented / Approved
Project stageConsented
PlanningOct 2025 (completed)
ConsentedApr 2026 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2026-06-15.
Registered planning capacity; not measured generation.
Tennis Courts, St Brides Castle - Solar Panels is a 0.24 MW solar farm project in Wales. The applicant or operator on record is HPB Assurance Limited. Planning permission has been granted as of April 2026 and it is awaiting construction. The determining authority is Pembrokeshire, reference NP/25/0572/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.240 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
HPB Assurance Limited
Owner / operator
HPB Assurance Limited
Year consented
2026
Location
Tennis Courts, St Brides Castle, St Brides, Haverfordwest, Dyfed, SA62 3AL