Solar Farm

Tennis Courts, St Brides Castle - Solar Panels

Tennis Courts, St Brides Castle, St Brides, Haverfordwest, Dyfed, SA62 3AL

Tennis Courts, St Brides Castle - Solar Panels is a 0.24 MW solar farm project in Wales. The applicant or operator on record is HPB Assurance Limited. Planning permission has been granted as of April 2026 and it is awaiting construction. The determining authority is Pembrokeshire…

Consented / Approved
Project stageConsented
  1. PlanningOct 2025 (completed)
  2. ConsentedApr 2026 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2026-06-15.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.240 MW
Registered Capacity

πŸ“‹ Project Overview

Tennis Courts, St Brides Castle - Solar Panels is a 0.24 MW solar farm project in Wales. The applicant or operator on record is HPB Assurance Limited. Planning permission has been granted as of April 2026 and it is awaiting construction. The determining authority is Pembrokeshire, reference NP/25/0572/FUL.

Site Schematic

SUBSTATION ? ha Β· 0.24 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.240 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperHPB Assurance Limited
Owner / operatorHPB Assurance Limited
Year consented2026
LocationTennis Courts, St Brides Castle, St Brides, Haverfordwest, Dyfed, SA62 3AL
RegionWales
Coordinates51.7512818Β°N, 5.1946943Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof
Solar Site Area (sqm)4507

πŸ“… Project Timeline

2025-10-06
2026-04-21