N/O Tengore Lane, Long Sutton, Langport,, Somerset, TA10 9JL
Tengore Lane Solar Development is a 5.8 MW solar farm project in South West. The applicant or operator on record is TGC Renewables. The scheme is currently in the planning system, submitted May 2012. The determining authority is Somerset, reference 12/01902/FUL.β¦
Revised
Project stageSuperseded by a new application
PlanningMay 2012 (completed)
Superseded by a new application (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Revised.
Official register: July 2026
Recorded status: Revised. Source record updated 2012-09-14.
Registered planning capacity; not measured generation.
Tengore Lane Solar Development is a 5.8 MW solar farm project in South West. The applicant or operator on record is TGC Renewables. The scheme is currently in the planning system, submitted May 2012. The determining authority is Somerset, reference 12/01902/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
5.800 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
TGC Renewables
Owner / operator
TGC Renewables
Location
N/O Tengore Lane, Long Sutton, Langport,, Somerset, TA10 9JL