Tenax Road - Renewable Energy Biomass Plant is a 3 MW bioenergy / waste project in North West. The applicant or operator on record is Fluid Leader Plc. The application has been withdrawn or the scheme abandoned. The determining authority is Trafford, reference H/70807.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJan 2009 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJun 2009 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2016-06-15.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

3.000 MW
Registered Capacity

πŸ“‹ Project Overview

Tenax Road - Renewable Energy Biomass Plant is a 3 MW bioenergy / waste project in North West. The applicant or operator on record is Fluid Leader Plc. The application has been withdrawn or the scheme abandoned. The determining authority is Trafford, reference H/70807.

πŸ”§ Technical Specifications

Capacity (MW)3.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperFluid Leader Plc
Owner / operatorFluid Leader Plc
Year consented2009
LocationDemolition Direct, Tenax Circle, Tenax Road, Trafford Park, Manchester, Greater Manchester, M17 1JT
RegionNorth West
Coordinates53.4753837Β°N, 2.3232715Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2009-01-21
2009-06-29