Teesside Renewable Energy Plant

Land At Clarence Works, Off Port Clarence Road, Port Clarence, Middlesborough, County Durham

Teesside Renewable Energy Plant is a 49 MW bioenergy / waste project in North East. The applicant or operator on record is Port Clarence Energy (Eco2). The application has been withdrawn or the scheme abandoned. The determining authority is Stockton-on-Tees, reference 14/1106/EIS…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningApr 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJul 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2015-06-17.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.000 MW
Registered Capacity

πŸ“‹ Project Overview

Teesside Renewable Energy Plant is a 49 MW bioenergy / waste project in North East. The applicant or operator on record is Port Clarence Energy (Eco2). The application has been withdrawn or the scheme abandoned. The determining authority is Stockton-on-Tees, reference 14/1106/EIS.

πŸ”§ Technical Specifications

Capacity (MW)49.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperPort Clarence Energy (Eco2)
Owner / operatorPort Clarence Energy (Eco2)
Year consented2014
LocationLand At Clarence Works, Off Port Clarence Road, Port Clarence, Middlesborough, County Durham
RegionNorth East
Coordinates54.5866582Β°N, 1.2130203Β°W

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2014-04-23
2014-07-23