Bioenergy / Waste

Teeside 3 EFW Plant

Haverton Hill Road, Billingham, Teeside, Cleveland, County Durham

Teeside 3 EFW Plant is a 9.9 MW bioenergy / waste project in North East. The applicant or operator on record is N.E.M. LTD. The application has been withdrawn or the scheme abandoned. The determining authority is Stockton-on-Tees, reference 00/0026/P.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJan 2000 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedAug 2000 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2010-01-25.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

9.900 MW
Registered Capacity

πŸ“‹ Project Overview

Teeside 3 EFW Plant is a 9.9 MW bioenergy / waste project in North East. The applicant or operator on record is N.E.M. LTD. The application has been withdrawn or the scheme abandoned. The determining authority is Stockton-on-Tees, reference 00/0026/P.

πŸ”§ Technical Specifications

Capacity (MW)9.900 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperN.E.M. LTD
Owner / operatorN.E.M. LTD
Year consented2000
LocationHaverton Hill Road, Billingham, Teeside, Cleveland, County Durham
RegionNorth East
Coordinates54.5954118Β°N, 1.2586181Β°W

Additional published register fields

Registered technologyEfW Incineration

πŸ“… Project Timeline

2000-01-20
2000-08-15