πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Other Registered Technology

Tees Valley Renewable Energy Facility - TV1

Reclamation Pond, Huntsman Drive Seal Sands, County Durham

Tees Valley Renewable Energy Facility - TV1 is a 49 MW other registered technology project in North East. The applicant or operator on record is Air Products. The application has been withdrawn or the scheme abandoned. The determining authority is Stockton-on-Tees, reference 11/0…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningFeb 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedAug 2011 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2017-03-08.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

49.000 MW
Registered Capacity

πŸ“‹ Project Overview

Tees Valley Renewable Energy Facility - TV1 is a 49 MW other registered technology project in North East. The applicant or operator on record is Air Products. The application has been withdrawn or the scheme abandoned. The determining authority is Stockton-on-Tees, reference 11/0359/EIS.

πŸ”§ Technical Specifications

Capacity (MW)49.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAir Products
Owner / operatorAir Products
Year consented2011
LocationReclamation Pond, Huntsman Drive Seal Sands, County Durham
RegionNorth East
Coordinates54.5610931Β°N, 1.3060819Β°W

Additional published register fields

Registered technologyAdvanced Conversion Technologies

πŸ“… Project Timeline

2011-02-15
2011-08-09