Tameside General Hospital Fountain Street, Lancashire, OL6 9RW
Tameside General Hospital, Fountain Street - Solar Panels is a 0.31 MW solar farm project in North West. The applicant or operator on record is Tameside and Glossop Integrated Care NHS Foundation Trust. The scheme is currently in the planning system, submitted June 2026. The detβ¦
In Planning
Project stageIn planning
PlanningJun 2026 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated date not supplied.
Registered planning capacity; not measured generation.
Tameside General Hospital, Fountain Street - Solar Panels is a 0.31 MW solar farm project in North West. The applicant or operator on record is Tameside and Glossop Integrated Care NHS Foundation Trust. The scheme is currently in the planning system, submitted June 2026. The determining authority is Tameside, reference 26/00463/NPV.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.310 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Tameside and Glossop Integrated Care NHS Foundation Trust
Owner / operator
Tameside and Glossop Integrated Care NHS Foundation Trust
Location
Tameside General Hospital Fountain Street, Lancashire, OL6 9RW