Bioenergy / Waste

Tame Power - Flexible Energy Facility

Tame Power, North East Side Of Tame Street, Stalybridge, Cheshire, SK15 1ST

Tame Power - Flexible Energy Facility is a 4.5 MW bioenergy / waste project in North West. The applicant or operator on record is AMP Energy Services Limited. Planning permission has been granted as of December 2024 and it is awaiting construction. The determining authority is Ta…

Consented / Approved
Project stageConsented
  1. PlanningOct 2024 (completed)
  2. ConsentedDec 2024 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2025-01-13.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

4.500 MW
Registered Capacity

πŸ“‹ Project Overview

Tame Power - Flexible Energy Facility is a 4.5 MW bioenergy / waste project in North West. The applicant or operator on record is AMP Energy Services Limited. Planning permission has been granted as of December 2024 and it is awaiting construction. The determining authority is Tameside, reference 24/00916/FUL.

πŸ”§ Technical Specifications

Capacity (MW)4.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAMP Energy Services Limited
Owner / operatorAMP Energy Services Limited
Year consented2024
LocationTame Power, North East Side Of Tame Street, Stalybridge, Cheshire, SK15 1ST
RegionNorth West
Coordinates53.4818034Β°N, 2.0730745Β°W

Additional published register fields

Registered technologyLandfill Gas
Are they re-applying (Old REPD Ref) 9839

πŸ“… Project Timeline

2024-10-10
2024-12-19