π Project Overview
Sytner BMW Sheffield, Brightside Way - Solar Panels is a 1.03 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Sytner Group Limited. Planning permission has been granted as of December 2025 and it is awaiting construction. The determining authority is Sheffield, reference 25/03219/PVPN.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 1 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Sytner Group Limited |
| Owner / operator | Sytner Group Limited |
| Year consented | 2025 |
| Location | Sytner BMW Sheffield Brightside Way, South Yorkshire, S9 2RQ |
| Region | Yorkshire and Humber |
| Coordinates | 53.4022576Β°N, 1.4337118Β°W |