Adj West Melton Electricity Substation, Elsecar Road, Brampton Bierlow, South Yorkshire, S63 6AG
Swangate Project - Energy Storage System is a 50 MW battery storage project in Yorkshire and Humber. The applicant or operator on record is Econergy International Limited. Planning permission has been granted as of September 2017 and it is awaiting construction. The determining aβ¦
Consented / Approved
Project stageConsented
PlanningJul 2017 (completed)
ConsentedSep 2017 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2022-06-09.
Registered planning capacity; not measured generation.
Swangate Project - Energy Storage System is a 50 MW battery storage project in Yorkshire and Humber. The applicant or operator on record is Econergy International Limited. Planning permission has been granted as of September 2017 and it is awaiting construction. The determining authority is Rotherham, reference RB2017/1132.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
50.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Econergy International Limited
Owner / operator
Econergy International Limited
Year consented
2017
Location
Adj West Melton Electricity Substation, Elsecar Road, Brampton Bierlow, South Yorkshire, S63 6AG