Surmer Hall, Church Walk - Solar Farm & Battery Storage is a 22 MW battery storage project in Eastern. The applicant or operator on record is Boultbee Brooks (Renewables Rowley Hill) Limited. Planning permission has been granted as of December 2024 and it is awaiting construction. The determining authority is Braintree, reference 23/02705/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 22 MW |
| Battery chemistry | Co-located with RE |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Boultbee Brooks (Renewables Rowley Hill) Limited |
| Owner / operator | Boultbee Brooks (Renewables Rowley Hill) Limited |
| Year consented | 2024 |
| Location | South Of Sturmer Hall Church Walk Sturmer, Suffolk, CB9 7BS |
| Region | Eastern |
| Coordinates | 52.051256Β°N, 0.4638124Β°E |