Adj National Grid Sundon Substation, Water End Lane, Chalton, Bedfordshire, LU4 9UJ
Sundon Substation is a 49.9 MW battery storage project in Eastern. The applicant or operator on record is Pivot Power / EDF Energy Renewables. It is recorded as operational since December 2025. The determining authority is Central Bedfordshire, reference CB/21/02829/FULL.β¦
OperationalΒ· Since 2025
Project stageOperating
PlanningJul 2021 (completed)
ConsentedJan 2022 (completed)
Construction (completed)
OperatingDec 2025 (current stage)
Closed (not yet reached)
Status in the official register: Operational.
Official register: July 2026
Recorded status: Operational. Source record updated 2026-03-06.
Registered planning capacity; not measured generation.
Sundon Substation is a 49.9 MW battery storage project in Eastern. The applicant or operator on record is Pivot Power / EDF Energy Renewables. It is recorded as operational since December 2025. The determining authority is Central Bedfordshire, reference CB/21/02829/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.900 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Pivot Power / EDF Energy Renewables
Owner / operator
Pivot Power / EDF Energy Renewables
Year consented
2022
Commissioned / target
2025
Location
Adj National Grid Sundon Substation, Water End Lane, Chalton, Bedfordshire, LU4 9UJ