π Project Overview
Sundon Substation is a 49.9 MW battery storage project in Eastern. The applicant or operator on record is Pivot Power / EDF Energy Renewables. It is recorded as operational since December 2025. The determining authority is Central Bedfordshire, reference CB/21/02829/FULL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 50 MW |
| Battery chemistry | Stand-alone Storage |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Pivot Power / EDF Energy Renewables |
| Owner / operator | Pivot Power / EDF Energy Renewables |
| Year consented | 2022 |
| Commissioned / target | 2025 |
| Location | Adj National Grid Sundon Substation, Water End Lane, Chalton, Bedfordshire, LU4 9UJ |
| Region | Eastern |
| Coordinates | 51.9311156Β°N, 0.4988194Β°W |