Sunderland Renewable Energy Centre (Hillthorn Farm) is a 27 MW other registered technology project in North East. The applicant or operator on record is Rolton Kilbride. The application has been withdrawn or the scheme abandoned. The determining authority is Sunderland, reference…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningOct 2017 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Appeal Withdrawn.

Official register: July 2026

Recorded status: Appeal Withdrawn. Source record updated 2019-12-18.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

27.000 MW
Registered Capacity

πŸ“‹ Project Overview

Sunderland Renewable Energy Centre (Hillthorn Farm) is a 27 MW other registered technology project in North East. The applicant or operator on record is Rolton Kilbride. The application has been withdrawn or the scheme abandoned. The determining authority is Sunderland, reference 17/02085/MW4.

πŸ”§ Technical Specifications

Capacity (MW)27.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRolton Kilbride
Owner / operatorRolton Kilbride
LocationLand At Hillthorn Farm, Washington, Tyne and Wear, Tyne and Wear, NE37 3HZ
RegionNorth East
Coordinates54.9092187Β°N, 1.4991933Β°W

Additional published register fields

Registered technologyAdvanced Conversion Technologies

πŸ“… Project Timeline

2017-10-24