Summerton Farm, Sageston - Wind Turbine is a 0.33 MW onshore wind project in Wales. The applicant or operator on record is Constantine Wind Energy Limited. The planning application was refused. The determining authority is Pembrokeshire, reference 23/0723/PA.…

Refused
Project stageRefused
  1. PlanningNov 2023 (completed)
  2. Refused (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Refused.

Official register: July 2026

Recorded status: Planning Permission Refused. Source record updated 2024-07-08.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.330 MW
Registered Capacity

πŸ“‹ Project Overview

Summerton Farm, Sageston - Wind Turbine is a 0.33 MW onshore wind project in Wales. The applicant or operator on record is Constantine Wind Energy Limited. The planning application was refused. The determining authority is Pembrokeshire, reference 23/0723/PA.

Site Schematic

WALES Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.330 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperConstantine Wind Energy Limited
Owner / operatorConstantine Wind Energy Limited
LocationNorth of Summerton Farm Sageston, Dyfed, SA70 8NS
RegionWales
Coordinates51.6849393Β°N, 4.7938762Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)0.33
No. of Turbines1
Height of Turbines (m)90

πŸ“… Project Timeline

2023-11-30