Stumpy Post is a 1.3 MW onshore wind project in South West. The applicant or operator on record is Windworks (National Wind Power). The planning application was refused. The determining authority is South Hams, reference 08/0175/03/F.β¦
Refused
Project stageRefused
PlanningMar 2003 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2005-08-26.
Registered planning capacity; not measured generation.
Stumpy Post is a 1.3 MW onshore wind project in South West. The applicant or operator on record is Windworks (National Wind Power). The planning application was refused. The determining authority is South Hams, reference 08/0175/03/F.