Solar Farm

Stud Solar Farm

Stud Farm, Ossington Road, Carlton On Trent, Nottinghamshire, NG23 6NX

Stud Solar Farm is a 25 MW solar farm project in East Midlands. The applicant or operator on record is Martifer Solar (Voltalia). The planning permission has expired. The determining authority is Newark and Sherwood, reference 15/00324/FULM.…

Expired
Project stageConsent lapsed
  1. PlanningFeb 2015 (completed)
  2. ConsentedJun 2015 (completed)
  3. Consent lapsed (project stopped here)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Permission Expired.

Official register: July 2026

Recorded status: Planning Permission Expired. Source record updated 2018-07-19.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

25.000 MW
Registered Capacity

πŸ“‹ Project Overview

Stud Solar Farm is a 25 MW solar farm project in East Midlands. The applicant or operator on record is Martifer Solar (Voltalia). The planning permission has expired. The determining authority is Newark and Sherwood, reference 15/00324/FULM.

Site Schematic

SUBSTATION ? ha Β· 25 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)25.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperMartifer Solar (Voltalia)
Owner / operatorMartifer Solar (Voltalia)
Year consented2015
LocationStud Farm, Ossington Road, Carlton On Trent, Nottinghamshire, NG23 6NX
RegionEast Midlands
Coordinates53.1727903Β°N, 0.833043Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)386400

πŸ“… Project Timeline

2015-02-19
2015-06-15