Solar Farm

Stublach Project Solar Farm

Stublach Gas Storage Project, Cheshire, CW9 7SE

Stublach Project Solar Farm is a 2.25 MW solar farm project in North West. The applicant or operator on record is Storengy UK Limited. Planning permission has been granted as of May 2021 and it is awaiting construction. The determining authority is Cheshire West and Chester, refe…

Consented / Approved
Project stageConsented
  1. PlanningNov 2020 (completed)
  2. ConsentedMay 2021 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2021-01-12.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

2.250 MW
Registered Capacity

πŸ“‹ Project Overview

Stublach Project Solar Farm is a 2.25 MW solar farm project in North West. The applicant or operator on record is Storengy UK Limited. Planning permission has been granted as of May 2021 and it is awaiting construction. The determining authority is Cheshire West and Chester, reference 20/04118/FUL.

Site Schematic

SUBSTATION ? ha Β· 2.25 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)2.250 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperStorengy UK Limited
Owner / operatorStorengy UK Limited
Year consented2021
LocationStublach Gas Storage Project, Cheshire, CW9 7SE
RegionNorth West
Coordinates53.2291793Β°N, 2.4612053Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)23200

πŸ“… Project Timeline

2020-11-04
2021-05-04