Stronelarig Hydro Scheme is a 10.7 MW conventional hydro project in Scotland. The applicant or operator on record is RWE npower. The application has been withdrawn or the scheme abandoned. The determining authority is Highland, reference IN2003700.…

Withdrawn
Project stageWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2005-05-12.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

10.700 MW
Registered Capacity

πŸ“‹ Project Overview

Stronelarig Hydro Scheme is a 10.7 MW conventional hydro project in Scotland. The applicant or operator on record is RWE npower. The application has been withdrawn or the scheme abandoned. The determining authority is Highland, reference IN2003700.

Site Schematic

UPPER RES. LOWER RES. PENSTOCK TAILRACE GEN. GRID HEAD: ?m Β· POWER: 10.700 MW Β· ? turbines

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)10.700 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRWE npower
Owner / operatorRWE npower
LocationStronelairg, Whitebridge, Highland
RegionScotland
Coordinates57.125999Β°N, 4.4216491Β°W

Additional published register fields

Registered technologyLarge Hydro