π Project Overview
Streatham Ice & Leisure, Streatham High Road - Solar Panels & ASHP is a 0.33 MW solar farm project in London. The applicant or operator on record is Cenergist Limited. Planning permission has been granted as of March 2024 and it is awaiting construction. The determining authority is Lambeth, reference 23/02725/RG4.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Cenergist Limited |
| Owner / operator | Cenergist Limited |
| Year consented | 2024 |
| Location | Streatham Ice And Leisure Centre 390 Streatham High Road, London, SW16 6HX |
| Region | London |
| Coordinates | 51.4243079Β°N, 0.1311943Β°W |