Unit 1 Strada Alwalton Hill, Peterborough, Cambridgeshire, PE7 3HH
Strada Alwalton Hill - Solar Panels is a 0.69 MW solar farm project in Eastern. The applicant or operator on record is Barclays Nominees (George Yard) Limited. Planning permission has been granted as of July 2022 and it is awaiting construction. The determining authority is Peterβ¦
Consented / Approved
Project stageConsented
PlanningMay 2022 (completed)
ConsentedJul 2022 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2022-07-15.
Registered planning capacity; not measured generation.
Strada Alwalton Hill - Solar Panels is a 0.69 MW solar farm project in Eastern. The applicant or operator on record is Barclays Nominees (George Yard) Limited. Planning permission has been granted as of July 2022 and it is awaiting construction. The determining authority is Peterborough, reference 22/00716/PRIOR.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.690 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Barclays Nominees (George Yard) Limited
Owner / operator
Barclays Nominees (George Yard) Limited
Year consented
2022
Location
Unit 1 Strada Alwalton Hill, Peterborough, Cambridgeshire, PE7 3HH