ew/o B2146 Breakneck Lane to Brooks Nap Walderton Stoughton Chichester, West Sussex, PO18 9ER
Stoughton - Ground Mounted Solar Panels is a 0.43 MW solar farm project in South East. The applicant or operator on record is Portsmouth Water. The planning application was refused. The determining authority is Chichester, reference SDNP/22/00625/LDP.β¦
Refused
Project stageRefused
PlanningMar 2022 (completed)
Refused (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Permission Refused.
Official register: July 2026
Recorded status: Planning Permission Refused. Source record updated 2022-03-18.
Registered planning capacity; not measured generation.
Stoughton - Ground Mounted Solar Panels is a 0.43 MW solar farm project in South East. The applicant or operator on record is Portsmouth Water. The planning application was refused. The determining authority is Chichester, reference SDNP/22/00625/LDP.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.430 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Portsmouth Water
Owner / operator
Portsmouth Water
Location
ew/o B2146 Breakneck Lane to Brooks Nap Walderton Stoughton Chichester, West Sussex, PO18 9ER