Stoneyhill is a 30.6 MW onshore wind project in Scotland. The applicant or operator on record is Ron Shanks Waste Management Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Aberdeenshire, reference N020466PF.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningDec 2002 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2005-06-10.
Registered planning capacity; not measured generation.
Stoneyhill is a 30.6 MW onshore wind project in Scotland. The applicant or operator on record is Ron Shanks Waste Management Ltd. The application has been withdrawn or the scheme abandoned. The determining authority is Aberdeenshire, reference N020466PF.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
30.600 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Ron Shanks Waste Management Ltd
Owner / operator
Ron Shanks Waste Management Ltd
Location
Just west of Stoneyhill
, Peterhead