Land East Of Bagworth Road Newbold Heath Newbold Verdon Leicestershire, Leicestershire

Stonehaven Wind Turbine is a 1.5 MW onshore wind project in East Midlands. The applicant or operator on record is Renewable Energy Systems (RES). The application has been withdrawn or the scheme abandoned. The determining authority is Hinckley and Bosworth, reference 14/00381/FUL…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningApr 2014 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJul 2014 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Abandoned.

Official register: July 2026

Recorded status: Abandoned. Source record updated 2016-02-26.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

1.500 MW
Registered Capacity

πŸ“‹ Project Overview

Stonehaven Wind Turbine is a 1.5 MW onshore wind project in East Midlands. The applicant or operator on record is Renewable Energy Systems (RES). The application has been withdrawn or the scheme abandoned. The determining authority is Hinckley and Bosworth, reference 14/00381/FUL.

Site Schematic

EAST MIDLANDS Β· ? turbines Β· ? kmΒ²

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)1.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperRenewable Energy Systems (RES)
Owner / operatorRenewable Energy Systems (RES)
Year consented2014
LocationLand East Of Bagworth Road Newbold Heath Newbold Verdon Leicestershire, Leicestershire
RegionEast Midlands
Coordinates52.6501644Β°N, 1.3384358Β°W

Additional published register fields

Registered technologyWind Onshore
Turbine Capacity (MW)1.5
No. of Turbines1

πŸ“… Project Timeline

2014-04-14
2014-07-23