Steyning WWTW, Kings Barn Lane, Steyning, West Sussex, West Sussex, BN44 3YR
Steyning Battery Energy Storage Facility is a 18 MW battery storage project in South East. The applicant or operator on record is AMDC Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Horsham, reference DC/18/0298.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningMar 2018 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2020-03-20.
Registered planning capacity; not measured generation.
Steyning Battery Energy Storage Facility is a 18 MW battery storage project in South East. The applicant or operator on record is AMDC Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Horsham, reference DC/18/0298.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
18.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
AMDC Energy
Owner / operator
AMDC Energy
Location