π Project Overview
Stephenson Road - Micro Energy Storage is a 0.2 MW battery storage project in North East. The applicant or operator on record is AMP Clean Energy. The scheme is currently in the planning system, submitted December 2024. The determining authority is Sunderland, reference 24/02574/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0 MW |
| Battery chemistry | Stand-alone Storage |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | AMP Clean Energy |
| Owner / operator | AMP Clean Energy |
| Location | North Side Of Stephenson Road, Stephenson, Washington, Tyne And Wear, NE37 2TT |
| Region | North East |
| Coordinates | 54.9253751Β°N, 1.5212121Β°W |