Steamboat Way, Glasshoughton - Solar Panels is a 0.77 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Power Zero Limited. The scheme is currently in the planning system, submitted June 2026. The determining authority is Wakefield, reference 2…

In Planning
Project stageIn planning
  1. PlanningJun 2026 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Application Submitted.

Official register: July 2026

Recorded status: Planning Application Submitted. Source record updated date not supplied.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.770 MW
Registered Capacity

πŸ“‹ Project Overview

Steamboat Way, Glasshoughton - Solar Panels is a 0.77 MW solar farm project in Yorkshire and Humber. The applicant or operator on record is Power Zero Limited. The scheme is currently in the planning system, submitted June 2026. The determining authority is Wakefield, reference 26/01018/SPN.

Site Schematic

SUBSTATION ? ha Β· 0.77 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.770 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperPower Zero Limited
Owner / operatorPower Zero Limited
LocationUnit 200 Steamboat Way Castleford, West Yorkshire, WF10 5XY
RegionYorkshire and Humber
Coordinates53.7084927Β°N, 1.3518307Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2026-06-11