πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
Renewable Energy

Staveley Power

Hall Lane, Staveley, Chesterfield, Derbyshire S43 3TP, Derbyshire

Staveley Power is a 2.1 MW renewable energy project in East Midlands. The applicant or operator on record is Waste Recycling Group. It is recorded as operational since April 2005. The determining authority is Chesterfield, reference CW2/0103/121 (site ref: 2.600.7).…

Operational Β· Since 2005
2 MW
Installed Capacity
2005
Commissioned

πŸ“‹ Project Overview

Staveley Power is a 2.1 MW renewable energy project in East Midlands. The applicant or operator on record is Waste Recycling Group. It is recorded as operational since April 2005. The determining authority is Chesterfield, reference CW2/0103/121 (site ref: 2.600.7).

πŸ”§ Technical Specifications

Capacity (MW)2 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperWaste Recycling Group
Owner / operatorWaste Recycling Group
Year consented2003
Commissioned / target2005
LocationHall Lane, Staveley, Chesterfield, Derbyshire S43 3TP, Derbyshire
RegionEast Midlands
Coordinates53.273873Β°N, 1.3611505Β°W

πŸ“… Project Timeline