Land At Top Farm and Little Stau, Airfield Industrial Estate, Little Staughton, Bedford, Bedfordshire, Cambridgeshire, MK44 2BN
Staughton Airfield Solar Farm is a 40 MW solar farm project in Eastern. The applicant or operator on record is GreenHedge (BayWa r.e.) / Next Energy Capital. It is recorded as operational since March 2020. The determining authority is Huntingdonshire, reference 15/00940/FUL.β¦
OperationalΒ· Since 2020
Project stageOperating
PlanningJun 2015 (completed)
ConsentedSep 2015 (completed)
ConstructionMar 2019 (completed)
OperatingMar 2020 (current stage)
Closed (not yet reached)
Status in the official register: Operational.
Official register: July 2026
Recorded status: Operational. Source record updated 2026-01-16.
Registered planning capacity; not measured generation.
Staughton Airfield Solar Farm is a 40 MW solar farm project in Eastern. The applicant or operator on record is GreenHedge (BayWa r.e.) / Next Energy Capital. It is recorded as operational since March 2020. The determining authority is Huntingdonshire, reference 15/00940/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
40.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
GreenHedge (BayWa r.e.) / Next Energy Capital
Owner / operator
GreenHedge (BayWa r.e.) / Next Energy Capital
Year consented
2015
Construction started
2019
Commissioned / target
2020
Location
Land At Top Farm and Little Stau, Airfield Industrial Estate, Little Staughton, Bedford, Bedfordshire, Cambridgeshire, MK44 2BN