Reflex Labels, North End Business Park, Station Road, Swineshead, Boston, Lincolnshire, PE20 3PW
Station Road, Swineshead - Solar PV System is a 0.25 MW solar farm project in East Midlands. The applicant or operator on record is Reflex Labels. Planning permission has been granted as of December 2021 and it is awaiting construction. The determining authority is Boston, refereβ¦
Consented / Approved
Project stageConsented
PlanningNov 2021 (completed)
ConsentedDec 2021 (current stage)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Permission Granted.
Official register: July 2026
Recorded status: Planning Permission Granted. Source record updated 2021-12-23.
Registered planning capacity; not measured generation.
Station Road, Swineshead - Solar PV System is a 0.25 MW solar farm project in East Midlands. The applicant or operator on record is Reflex Labels. Planning permission has been granted as of December 2021 and it is awaiting construction. The determining authority is Boston, reference B/21/0479.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
0.250 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Reflex Labels
Owner / operator
Reflex Labels
Year consented
2021
Location
Reflex Labels, North End Business Park, Station Road, Swineshead, Boston, Lincolnshire, PE20 3PW