Land Off, Station Road, Nursling, Southampton,, Hampshire, SO16 0AH
Station Road is a 49.5 MW battery storage project in South East. The applicant or operator on record is Harmony Energy Storage. The application has been withdrawn or the scheme abandoned. The determining authority is Test Valley, reference 17/01205/FULLS.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningMay 2017 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2018-11-23.
Registered planning capacity; not measured generation.
Station Road is a 49.5 MW battery storage project in South East. The applicant or operator on record is Harmony Energy Storage. The application has been withdrawn or the scheme abandoned. The determining authority is Test Valley, reference 17/01205/FULLS.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
49.500 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Harmony Energy Storage
Owner / operator
Harmony Energy Storage
Location
Land Off, Station Road, Nursling, Southampton,, Hampshire, SO16 0AH