Standby Embedded Stor Power Plant, High Flatworth, Tyne Tunnel Trading Estate, North Shields, Tyne And Wear, NE29 7UZ
Standby Embedded Stor Power Plant - Battery storage is a 20 MW battery storage project in North East. The applicant or operator on record is Green Frog Power 214 Limited. It is recorded as under construction since October 2022. The determining authority is North Tyneside, referenβ¦
Under Construction
Project stageUnder construction
PlanningApr 2021 (completed)
ConsentedJun 2021 (completed)
ConstructionOct 2022 (current stage)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Under Construction.
Official register: July 2026
Recorded status: Under Construction. Source record updated 2023-01-16.
Registered planning capacity; not measured generation.
Standby Embedded Stor Power Plant - Battery storage is a 20 MW battery storage project in North East. The applicant or operator on record is Green Frog Power 214 Limited. It is recorded as under construction since October 2022. The determining authority is North Tyneside, reference 21/01109/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
20.000 MW
Battery chemistry
Stand-alone Storage
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Green Frog Power 214 Limited
Owner / operator
Green Frog Power 214 Limited
Year consented
2021
Construction started
2022
Location
Standby Embedded Stor Power Plant, High Flatworth, Tyne Tunnel Trading Estate, North Shields, Tyne And Wear, NE29 7UZ