Stainton Way - Micro Energy storage

Hemlington Grange Farm, Stainton Way, Hemlington, Middlesbrough, Cleveland, TS8 9GL

Stainton Way - Micro Energy storage is a 0.2 MW battery storage project in North East. The applicant or operator on record is AMP Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Middlesbrough, reference 24/0383/FUL.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningSep 2024 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2025-05-12.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.200 MW
Power Capacity

πŸ“‹ Project Overview

Stainton Way - Micro Energy storage is a 0.2 MW battery storage project in North East. The applicant or operator on record is AMP Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Middlesbrough, reference 24/0383/FUL.

Site Schematic

GRID CONNECTION TRANSFORMER 33 kV DC BUSBAR 1234567891011121314151617181920 ? Γ— Battery Units

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.200 MW
Battery chemistryStand-alone Storage

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperAMP Clean Energy
Owner / operatorAMP Clean Energy
LocationHemlington Grange Farm, Stainton Way, Hemlington, Middlesbrough, Cleveland, TS8 9GL
RegionNorth East
Coordinates54.5174921Β°N, 1.2409206Β°W

Additional published register fields

Registered technologyBattery

πŸ“… Project Timeline

2024-09-24