Stainton Way - Micro Energy storage is a 0.2 MW battery storage project in North East. The applicant or operator on record is AMP Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Middlesbrough, reference 24/0383/FUL.β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningSep 2024 (completed)
Withdrawn / abandoned (project stopped here)
Consented (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Planning Application Withdrawn.
Official register: July 2026
Recorded status: Planning Application Withdrawn. Source record updated 2025-05-12.
Registered planning capacity; not measured generation.
Stainton Way - Micro Energy storage is a 0.2 MW battery storage project in North East. The applicant or operator on record is AMP Clean Energy. The application has been withdrawn or the scheme abandoned. The determining authority is Middlesbrough, reference 24/0383/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.