Spratsgate Lane Siddington, Gloucestershire, GL7 6QA
Spratsgate Lane, Siddington - Solar Farm and Battery Energy Storage System is a 25 MW solar farm project in South West. The applicant or operator on record is Aura Power Developments Limited. The scheme is currently in the planning system, submitted June 2025. The determining autβ¦
In Planning
Project stageIn planning
PlanningJun 2025 (current stage)
Consented (not yet reached)
Construction (not yet reached)
Operating (not yet reached)
Closed (not yet reached)
Status in the official register: Planning Application Submitted.
Official register: July 2026
Recorded status: Planning Application Submitted. Source record updated 2025-08-11.
Registered planning capacity; not measured generation.
Spratsgate Lane, Siddington - Solar Farm and Battery Energy Storage System is a 25 MW solar farm project in South West. The applicant or operator on record is Aura Power Developments Limited. The scheme is currently in the planning system, submitted June 2025. The determining authority is Cotswold, reference 25/01623/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
25.000 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Aura Power Developments Limited
Owner / operator
Aura Power Developments Limited
Location
Spratsgate Lane Siddington, Gloucestershire, GL7 6QA