Bioenergy / Waste

South Beach Parade/South Denes Rd

South Beach Parade, And South Denes Rd Adj, Outer Harbour, Great Yarmouth, Norfolk, NR30 3EH

South Beach Parade/South Denes Rd is a 5.5 MW bioenergy / waste project in Eastern. The applicant or operator on record is Energy Circle. The application has been withdrawn or the scheme abandoned. The determining authority is Great Yarmouth, reference 06/16/0379/LDO.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningJun 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2016-12-23.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.500 MW
Registered Capacity

πŸ“‹ Project Overview

South Beach Parade/South Denes Rd is a 5.5 MW bioenergy / waste project in Eastern. The applicant or operator on record is Energy Circle. The application has been withdrawn or the scheme abandoned. The determining authority is Great Yarmouth, reference 06/16/0379/LDO.

πŸ”§ Technical Specifications

Capacity (MW)5.500 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperEnergy Circle
Owner / operatorEnergy Circle
LocationSouth Beach Parade, And South Denes Rd Adj, Outer Harbour, Great Yarmouth, Norfolk, NR30 3EH
RegionEastern
Coordinates52.5944965Β°N, 1.7361673Β°E

Additional published register fields

Registered technologyBiomass (dedicated)

πŸ“… Project Timeline

2016-06-17