Solar Farm

Sortimo, Appleton Thorn - Solar Panels

Sortimo, Appleton Thorn, Cheshire, WA4 4RB

Sortimo, Appleton Thorn - Solar Panels is a 0.35 MW solar farm project in North West. The applicant or operator on record is Sortimo. The application has been withdrawn or the scheme abandoned. The determining authority is Warrington, reference 2026/00261/PA14J.…

Withdrawn
Project stageWithdrawn / abandoned
  1. PlanningFeb 2026 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Planning Application Withdrawn.

Official register: July 2026

Recorded status: Planning Application Withdrawn. Source record updated 2026-05-19.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.350 MW
Registered Capacity

πŸ“‹ Project Overview

Sortimo, Appleton Thorn - Solar Panels is a 0.35 MW solar farm project in North West. The applicant or operator on record is Sortimo. The application has been withdrawn or the scheme abandoned. The determining authority is Warrington, reference 2026/00261/PA14J.

Site Schematic

SUBSTATION ? ha Β· 0.35 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.350 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperSortimo
Owner / operatorSortimo
LocationSortimo, Appleton Thorn, Cheshire, WA4 4RB
RegionNorth West
Coordinates53.3535618Β°N, 2.5314306Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2026-02-25