Solar Farm

Solar Way - Solar Panels

7 Solar Way, Enfield, London, EN3 7XY

Solar Way - Solar Panels is a 0.43 MW solar farm project in London. The applicant or operator on record is JJ Fast Food Limited. Planning permission has been granted as of May 2024 and it is awaiting construction. The determining authority is Enfield, reference 23/03347/PRV.…

Consented / Approved
Project stageConsented
  1. PlanningOct 2023 (completed)
  2. ConsentedMay 2024 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2024-05-30.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.430 MW
Registered Capacity

πŸ“‹ Project Overview

Solar Way - Solar Panels is a 0.43 MW solar farm project in London. The applicant or operator on record is JJ Fast Food Limited. Planning permission has been granted as of May 2024 and it is awaiting construction. The determining authority is Enfield, reference 23/03347/PRV.

Site Schematic

SUBSTATION ? ha Β· 0.43 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.430 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperJJ Fast Food Limited
Owner / operatorJJ Fast Food Limited
Year consented2024
Location7 Solar Way, Enfield, London, EN3 7XY
RegionLondon
Coordinates51.6768925Β°N, 0.0216485Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof

πŸ“… Project Timeline

2023-10-19
2024-05-17