Land at Fields Farm, Southam, Warwickshire, CV47 2HD
Solar Farm at Fields Farm (Phase 2) is a 3.8 MW solar farm project in West Midlands. The applicant or operator on record is Foresight Group (TGC Renewables). The application has been withdrawn or the scheme abandoned. The determining authority is Stratford-on-Avon, reference 15/0β¦
Withdrawn
Project stageWithdrawn / abandoned
PlanningMar 2015 (completed)
Withdrawn / abandoned (project stopped here)
ConsentedJun 2015 (not reached)
Construction (not reached)
Operating (not reached)
Closed (not reached)
Status in the official register: Abandoned.
Official register: July 2026
Recorded status: Abandoned. Source record updated 2016-11-25.
Registered planning capacity; not measured generation.
Solar Farm at Fields Farm (Phase 2) is a 3.8 MW solar farm project in West Midlands. The applicant or operator on record is Foresight Group (TGC Renewables). The application has been withdrawn or the scheme abandoned. The determining authority is Stratford-on-Avon, reference 15/00767/FUL.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
Capacity (MW)
3.800 MW
π Grid Connection & Infrastructure
π’ Development & Ownership
Developer
Foresight Group (TGC Renewables)
Owner / operator
Foresight Group (TGC Renewables)
Year consented
2015
Location
Land at Fields Farm, Southam, Warwickshire, CV47 2HD