Solar Farm at Fields Farm (Phase 1)

Land at Fields Farm, Southam, Warwickshire, CV47 2HD

Solar Farm at Fields Farm (Phase 1) is a 5 MW solar farm project in West Midlands. The applicant or operator on record is Foresight Group (TGC Renewables). It is recorded as operational since March 2016. The determining authority is Stratford-on-Avon, reference 15/00767/FUL.…

Operational Β· Since 2016
Project stageOperating
  1. PlanningMar 2015 (completed)
  2. ConsentedJun 2015 (completed)
  3. ConstructionJan 2016 (completed)
  4. OperatingMar 2016 (current stage)
  5. Closed (not yet reached)

Status in the official register: Operational.

Official register: July 2026

Recorded status: Operational. Source record updated 2016-09-20.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

5.000 MW
Registered Capacity
2016
Commissioned

πŸ“‹ Project Overview

Solar Farm at Fields Farm (Phase 1) is a 5 MW solar farm project in West Midlands. The applicant or operator on record is Foresight Group (TGC Renewables). It is recorded as operational since March 2016. The determining authority is Stratford-on-Avon, reference 15/00767/FUL.

Site Schematic

SUBSTATION ? ha Β· 5 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)5.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperForesight Group (TGC Renewables)
Owner / operatorForesight Group (TGC Renewables)
Year consented2015
Construction started2016
Commissioned / target2016
LocationLand at Fields Farm, Southam, Warwickshire, CV47 2HD
RegionWest Midlands
Coordinates52.2449267Β°N, 1.4102246Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarGround
Solar Site Area (sqm)162000

πŸ“… Project Timeline

2015-03-16
2015-06-29
2016-01-04