Slyfield Industrial Estate, Slyfield - Solar PV System is a 0.15 MW solar farm project in South East. The applicant or operator on record is Mercedes Benz Of Guildford. Planning permission has been granted as of July 2024 and it is awaiting construction. The determining authority is Guildford, reference 24/W/00057.
Site Schematic
Schematic diagram β not to scale. Illustrative layout based on project specifications.
π§ Technical Specifications
| Capacity (MW) | 0.150 MW |
π Grid Connection & Infrastructure
π’ Development & Ownership
| Developer | Mercedes Benz Of Guildford |
| Owner / operator | Mercedes Benz Of Guildford |
| Year consented | 2024 |
| Location | Mercedes Benz Of Guildford, Moorfield Road, Slyfield Industrial Estate, Guildford, Surrey, GU1 1RU |
| Region | South East |
| Coordinates | 51.2608189Β°N, 0.5688123Β°W |
Additional published register fields
| Registered technology | Solar Photovoltaics |
|---|---|
| Mounting Type for Solar | Roof |
| Are they re-applying (Old REPD Ref) | 16298 |