Solar Farm

Slyfield Industrial Estate, Slyfield - Solar PV System

Mercedes Benz Of Guildford, Moorfield Road, Slyfield Industrial Estate, Guildford, Surrey, GU1 1RU

Slyfield Industrial Estate, Slyfield - Solar PV System is a 0.15 MW solar farm project in South East. The applicant or operator on record is Mercedes Benz Of Guildford. The scheme is currently in the planning system, submitted April 2024. The determining authority is Guildford, r…

Revised
Project stageSuperseded by a new application
  1. PlanningApr 2024 (completed)
  2. Superseded by a new application (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Status in the official register: Revised.

Official register: July 2026

Recorded status: Revised. Source record updated 2024-06-17.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

0.150 MW
Registered Capacity

πŸ“‹ Project Overview

Slyfield Industrial Estate, Slyfield - Solar PV System is a 0.15 MW solar farm project in South East. The applicant or operator on record is Mercedes Benz Of Guildford. The scheme is currently in the planning system, submitted April 2024. The determining authority is Guildford, reference 24/W/00031.

Site Schematic

SUBSTATION ? ha Β· 0.15 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)0.150 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperMercedes Benz Of Guildford
Owner / operatorMercedes Benz Of Guildford
LocationMercedes Benz Of Guildford, Moorfield Road, Slyfield Industrial Estate, Guildford, Surrey, GU1 1RU
RegionSouth East
Coordinates51.2608189Β°N, 0.5688123Β°W

Additional published register fields

Registered technologySolar Photovoltaics
Mounting Type for SolarRoof
Are they re-applying (New REPD Ref)16499

πŸ“… Project Timeline

2024-04-22