Solar Farm

Skye Green Solar Farm

Feeringbury Farm, Coggeshall Road, Feering, Colchester, Essex, CO5 9RB

Skye Green Solar Farm is a 15 MW solar farm project in Eastern. The applicant or operator on record is PS Renewables Limited. Planning permission has been granted as of April 2025 and it is awaiting construction. The determining authority is Braintree, reference 24/02658/FUL.…

Consented / Approved
Project stageConsented
  1. PlanningDec 2024 (completed)
  2. ConsentedApr 2025 (current stage)
  3. Construction (not yet reached)
  4. Operating (not yet reached)
  5. Closed (not yet reached)

Status in the official register: Planning Permission Granted.

Official register: July 2026

Recorded status: Planning Permission Granted. Source record updated 2026-02-16.

Registered planning capacity; not measured generation.

DESNZ source publication Β· Search the full register Β· Definitions and coverage

15.000 MW
Registered Capacity

πŸ“‹ Project Overview

Skye Green Solar Farm is a 15 MW solar farm project in Eastern. The applicant or operator on record is PS Renewables Limited. Planning permission has been granted as of April 2025 and it is awaiting construction. The determining authority is Braintree, reference 24/02658/FUL.

Site Schematic

SUBSTATION ? ha Β· 15 MW Β· ? panels

Schematic diagram β€” not to scale. Illustrative layout based on project specifications.

πŸ”§ Technical Specifications

Capacity (MW)15.000 MW

πŸ”Œ Grid Connection & Infrastructure

🏒 Development & Ownership

DeveloperPS Renewables Limited
Owner / operatorPS Renewables Limited
Year consented2025
LocationFeeringbury Farm, Coggeshall Road, Feering, Colchester, Essex, CO5 9RB
RegionEastern
Coordinates51.8609977Β°N, 0.7055487Β°E

Additional published register fields

Registered technologySolar Photovoltaics
CfD Allocation RoundAR7a
CfD Capacity (MW)15
Mounting Type for SolarGround
Solar Site Area (sqm)228500

πŸ“… Project Timeline

2024-12-17
2025-04-03